Solar Installation Checklist

A practical checklist for comparing solar installation quotes, equipment, scope, warranties, commissioning and handover.

Solar installer working on a roof

Before requesting quotes

  • Collect 6–12 months of electricity-use information if available.
  • Write down critical loads and backup priorities.
  • Photograph the main electrical panel, meter area and roof/site.
  • Note existing generator, UPS, battery or solar equipment.
  • Decide whether you value bill reduction, backup, off-grid resilience or all three.

What every proposal should identify

  • Exact panel, inverter and battery models
  • PV DC capacity and inverter AC rating as separate numbers
  • Usable battery capacity and output power
  • Mounting system and roof attachment method
  • Protection devices and electrical modifications
  • Monitoring and communications
  • Expected production assumptions
  • Product and workmanship warranties
  • Permits, utility applications and inspection responsibilities

At commissioning and handover

  • Receive equipment datasheets and warranty documentation.
  • Get monitoring access in your own account where possible.
  • Ask for shutdown/startup and emergency instructions.
  • Confirm breaker, isolator and circuit labels.
  • Keep the final single-line diagram or system schematic if supplied.
  • Record serial numbers and installation photos.