Solar installer working on a roofBetter quotes start with a better brief.
Installer discovery

Compare the scope—not only the price at the bottom.

Prepare a consistent project brief, compare solar quotes and evaluate installers on scope, assumptions, support and workmanship—not price alone.

Before the first call

Give every installer the same starting information.

01

Energy

Monthly/daily kWh, outage pattern and which loads are critical.

02

Site

Roof or land, building type, existing electrical equipment and access.

03

Goal

Bill reduction, backup, off-grid operation, generator displacement or a mix.

04

Constraints

Budget range, timeline, future loads and any equipment already owned.

Proposal comparison

A cheap quote can be a smaller scope wearing the same system-size label.

Ask for exact models and written assumptions. “8 kW system” is not enough information to compare two proposals.

Line itemInstaller AInstaller BWhat to ask
PV modulesExact model?Exact model?Quantity, wattage, warranty, layout
InverterExact model?Exact model?Architecture, MPPT, backup output
BatteryUsable kWh?Usable kWh?Power, warranty, compatibility
Protection & mountingIncluded?Included?Ask for scope and exclusions
SupportResponse path?Response path?Workmanship warranty, monitoring, service

A better installer search starts before the first sales call

Give every installer the same project brief. That reduces the chance that one quote includes battery backup, electrical work and protection while another appears cheaper because those items are missing.

Your project brief should include

  • Property location and property type
  • Recent electricity use or bill information
  • Critical loads
  • Backup duration target
  • Known roof/site constraints
  • Existing generator, UPS or solar equipment
  • Budget range if you have one
  • Desired project timeline

Compare the proposals line by line

Area What to compare
Equipment Exact models, not “Tier 1 panels” or “10 kWh lithium battery”
Scope Mounting, protection, cabling, distribution changes, monitoring, permits
Performance Production assumptions, backup limits, excluded loads
Warranty Product warranty, workmanship, response process, local support
Commercial Payment schedule, change-order process, taxes, exclusions

Red flags

  • Refusing to name the exact equipment before payment
  • Guaranteed savings without showing assumptions
  • No explanation of backup-load limits
  • No documentation or commissioning handover
  • Pressure to pay immediately because a “deal ends today”

Create a project brief

Primary sources and further reading